Existing vault renovations
Purchasing a new Linear Accelerator is an exciting investment for your medical practice. It’s our mission to make sure you have a seamless progression with your new medical equipment installation.
Our vaults are prepped in as little as 2-3 weeks keeping your timeline on track.
Your newly upgraded vault makes installing a new machine effortlessly.
Our process saves you time and money by renovating the room the right way.
Shielding construction
We have full design-build construction capabilities with over 30 years of experience in new vault construction. We have a team of engineers, physicists, architects, and construction consultants to handle any project of any size or scope.
Peace of mind as our team allows us to handle the project from beginning consultation to final certificate of occupancy.
We work as a team to discover the best, and most efficient, option in terms of time, budget, and resources, for your project.
The Original Elekta Vault Cast-In-Pace System
We offer an array of products outlined in the Elekta Linear Accelerator Site Planning Guide that will help make your new machine installation effortless.
Leave-in-place raceway and floor pit made in high-quality steel for easy installation.
The most convenient electrical wall-mounted raceway for guiding wires to the CITB box.
On-site consulting, delivery, and installation available for all of our products.
Our solutions were designed specifically to handle the needs of an Elekta install of equipment changeout.
Radiation Shielding Products
Already have a contractor for your radiation shielding project? No problem, we offer a wide variety of products for your new treatment facility.
Vault Doors & Frames
Lead Lined Vault Doors and Vault Door Frames
Modular Vault Systems
Cast-in-place systems
and much more!
Need an experts opinion?
Our company has been a guiding hand to medical facilities for over 20 years, we help medical facilities determine the feasibility of their location and project scope:
Keep your project on budget by eliminating any issues before construction starts.
Determine if the current vault is suitable to accept your new machine.
Create a roadmap strategy that outlines the necessary renovations to accept a new machine.